JSHP Transformer shipped seven units in one vessel to Houston, Texas. One of them is a 500 kV, 340 MVA GSU with a six-month Ex Works lead time. Over the past 20+ years, JSHP has shipped an average of two to three MPT units per day.

JSHP Shipped a 500kV 340MVA GSU in 6 months — image 1
JSHP Shipped a 500kV 340MVA GSU in 6 months — image 2
JSHP Shipped a 500kV 340MVA GSU in 6 months — image 3
JSHP Shipped a 500kV 340MVA GSU in 6 months — image 4
Back to News